IRICEN LGS Examination Sample Question Paper

Technical Paper :
Note :-
( I ) Attempt any four questions.
( ii ) All questions carry equal marks.

Related / Similar Question Paper : IRICEN LDCE Question Bank

Q.1: Describe the procedures for acquisition and relinquishment of land.

Q.2.- Write short notes on any Three of the following :
a) Directed track maintenance.
b) Measured shovel packing.
c) Procedure for presage of over dimensional consignment.
d) LWR
e) Building Cost Index.

Q.3: Anclear car has run over trunk rout section, the chart indicates a high percentage under ‘C’ category in the difference to track parameters. Describe the track parameters and tolerances adopted in Anclear car analysis and what steps will be taken by you to improve the track standards.

Q.4.- Fill in blanks :
i. Quantity of cement required for a cubic meter of concrete is 1 : 1½ : 3 mix is …… Bags.
ii. Vertical clearance for FOB in AC electrified section is ………..
iii. Length of BG passenger Platform is …………
iv. Distance from edge of a passenger platform is an isolated structure is ……….
v. Volume of Red lead paint required for one coat of paint on steel working area 100 m2 is ….. Liters.
vi. Number of bricks required for one m3 of brick masonry is …….. numbers.
vii. Length of BG goods loops is ……….. m.

Q.5:( a ) When are bridge inspections to be carried out and by whom.
( b ) What is the responsibility of a ADEN with regard to the inspection of bridge.
( c ) What bridges would be classified as important and what special precaution should be taken with regard to their maintenance.

Q.6:Describe in detail the system of monsoon patrolling.

Paper I

Q.1:( a ) What are the location where LWR is prohibited.
( b ) Give details procedure of distressing of LWR.

Q.2:A wing wall of a girder bridge having a span of 20 m is leaning. Height of the girder from bed level is 4 m. Describe the bridge rehabilitation procedure.

Q.3: What are the permitted locations for laying concrete sleeper. Describe the mechanical relaying.

Q.4.- Write short notes on :
i. SEJ
ii. Moveable switch.
iii. Diamond.
iv. Catch siding.

Q.5- What are the classification of high speed routs and what are the standards for each rout category of the following :
( I ) Rails.
( ii ) Sleepers.
( iii ) Fastenings.
( iv ) Ballast cushion.

Q.6: How will you include your work in works programme.

Paper II

Q.7.- Say whether right or wrong :
i. Estimate is required for renewal of ballast.
ii. Supplementary estimate is required if some of the items are left in the original estimate.
iii. Revised estimate is required when at any stage of the work the sanctioned cost if a work is likely to exceed.
iv. Abstract estimate is required for officers to give administrative approval for a work.

Q.8.- Define the following :
i. Adequate distance.
ii. Act.
iii. Fouling mark.
iv. Facing / Trailing direction.
v. Block station.
vi. Authority to proceed.
vii. PWI
viii. Gate.

Paper III

Q.1: What are different types of patrolling in this railway? Describe the double frequency patrolling.

Q.2.- Write brief inspection of the following bridges :
a) An arch 1 / 9.10 m.
b) Girder bridge 3 / 30.10 m.

Q.3: What are works involving CRS’s sanction? Describe the method to obtain CRS’s sanction to open a new line.

Q.4.- Write short notes on :
i. Assisted siding.
ii. Urgency certificates.
iii. Hospital leaves facilities.
iv. Grow more food campaign.

Q.5: A 2.5 x 2.5 x 2.5 m box is to be inserted on a double line section having bank 4.8 m. high using the RH girder, describe your planning to do the work.

Q.6: A busy single line section having 3 stations is to be doubles. The section having major and important bridges, Describe the method.

1 Comment
Add a Comment
  1. Write note on monsoon precaution for track bridge.