CE2402 Estimation & Quantity Surveying Question Bank : dmice.ac.in
Name of the College : DMI College OF Engineering
Subject : Estimation And Quantity Surveying
Website : dmice.ac.in
Document type : Question Bank
Download Estimation And Quantity Surveying Question Paper : https://www.pdfquestion.in/uploads/dmice.ac.in/349-CE2402.docx
DMICE Estimation & Quantity Surveying Question Bank
SJCET / THANJAVUR / CIVIL DEPARTMENT
UNIT-I :
Related : DMICE EC2029 Digital Image Processing B.E Question Bank : www.pdfquestion.in/2765.html
2 MARKS
** What are the types of estimate?
** Estimate the quantities of brickwork and plastering required in a wall 4m long, 3m high And 30 cm thick. Calculate also the cost if the rate of brickwork is Rs.32.00 per cu.m and of plastering is Rs. 8.50 per sq.m
** What are the main components of culvert?
** Define lead and lift
** Differentiate Floor area and carpet area?
** A cement concrete road (1:2:3) is to be constructed over the existing water bound macadam road .The thickness of slab =10cm.The length of the road is one km and the width 3.60m.Calculate the quality of cement concrete and the material required,
** What are the types of arches?
** Define culvert
** What is canal fall?
** What are the types of culvert?
** Briefly explain about preliminary Estimate
** Write the duties of quantity surveyor
** What are the methods of taking out quantities?
** What is prime cost
** What is schedule of rates?
** Define joineries
** Define estimate
** What is the importance of soak pit?
** List the various sanitary fittings?
** Draw and mention the parts of culvert
16 marks
** Calculate the quantities of box culvert.
a) Earth work in foundation
b) Sand filling
c) PCC in foundation
d) Brickwork cm 1:4 in foundation
d) RCC 1:2:4 cover slab
e) Brickwork cm 1:4 in parapet
** What are the various methods of estimate
** Explain in detail about
** Joineries
** Arch types
** Abstract estimate
** Supplementary estimate
** Estimate the quantities of brickwork in an arch over 1.8m span opening. the arch are 40cm thick and breadth of wall is 40cm
** Prepare the detailed estimate of two room building with front verandah from the drawing
a) BW in cm 1:5 in superstructure
b) Earth work excavation
c) Ceiling plastering cm 1:3
** What are the methods of measurement and give the units of measurement for the following items
** Plinth beam
** Plastering
** Flooring
** Earthwork excavation
** Prepare a detailed estimate of a septic tank in the soak pit and calculate the quantities for
** Earth work excavation
** PCC in foundation 1:3:6
** Brickwork cm 1:4 in septic tank
** Brickwork cm 1:6 with second class brick in soak pit
** Precast RCC work of roof cover slab
** Plastering with cm 1:3 in 12mm thick
** Draw the different types of sanitary fittings?
** Calculate the quantities of all item of work for the construction of retaining wall for length of 20m.
** Calculate the quantities of following item in fig
** First class Brickwork cm 1:6 with superstructure include parapet
** PCC in foundation
** Ceiling plastering