10CV55-Hydrology and Irrigation Engineering B.E Question Bank : sjbit.edu.in
Name of the College : SJB Institute of Technology
Subject Code/Name : 10CV55-Hydrology and Irrigation Engineering
Dept : Civil Engineering
Degree : B.E
SEM: : V
Website : sjbit.edu.in
Document Type : Question Bank
Download Model Question Paper : https://www.pdfquestion.in/uploads/sjbit.edu.in/3213-CIVIL-V-HYDROLOGY%20AND%20IRRIGATION%20ENGINEERING%20%5b10CV55%5d-QUESTION%20PAPER.pdf
SJB Hydrology & Irrigation Engineering Question Bank
UNIT I
INTRODUCTION & PRECIPITATION
1. Define precipitation. What is cyclonic precipitation? Distinguish between cold front and warm front (June2011, July 2012, Dec2013, July 2014) .
2. Differentiate between recording and non – recording type of rain gauges (Dec2013,July 2014)
Related : SJB Institute of Technology 12SCN323 Advanced Storage Area Networks B.E Question Bank : www.pdfquestion.in/3224.html
3. With a neat sketch, explain the working of a self recording rain gauge.( Dec2012)
4. Define hydrology. With a neat sketch, explain the Horton’s qualitative representation of the hydrologic cycle.(June 2011, July 2012, Jan 2013)
5. Define precipitation. Explain different forms of precipitation. (June2011, july 2013)
6. Critically compare recording rain gauge (self) with non recording type raingauge.(June2011, 2012)
7. Briefly explain optimum number of rain gauge stations in a catchment.(Jan2012, July 2013)
8. Explain the methods for the estimation of missing precipitation record(June2011, june2012)
9. During a month, a rain gauge went out of order while the other four gauges in the basin reported rainfalls of 110, 90, 120 and 115mm. If the normal annual rainfall for these four gauges are 115, 95, 125 and 120mm respectively and the normal rainfall for the broken gauge is 98cm, estimate the monthly rainfall at the broken gauge.(June2011,2012)
10. A Lake had a water surface elevation of 103.200m above datum at the beginning of certain month. In that month the lake reserved an average inflow of 6.0cumecs from surface runoff sources. In the same period outflow from the lake have an average value of 6.5 cumecs. Further in that month the lake received a rainfall of 145mm and evaporation from lake surface was estimated at 6.10 cm.Write the water budget equation for lake & calculate the water surface elevation of the lake at end of month. The average lake surface area may be taken as 5000 hectares. Assume that there is no contribution to or from ground water storage. .(June 2011,Jan2012)
11. A small catchment area of 150hectare received a rainfall of 10.5cm in 90 min due to a storm at a the outlet of catchment draining the catchment was dry before the storm & experienced a runoff lasting for 10 hrs with average discharge of 1.5 m3/s the stream was dry again after runoff event. (June 2011,june2012)
a) What is amount of water which was not available to runoff due to combine effect of infiltration evaporation?
b) What is the ratio of runoff to precipitation.
UNIT II
Losses From Precipitation
1. With a neat sketch, explain the working of double ring infiltrometer.( June 2011)
2. Define the term infiltration capacity of a soil. Explain Horton’s infiltration capacity curve, with a neat sketch. (July 2011)
3. Describe ISI standard evaporation pan, with a neat sketch. (Jan 2011, July 2012,June 2013)
4. For the given data below, Determine the evapotranspiration . The crop factor may be taken as 0.8 (Dec 2012)
5. Briefly explain “Evaporation Process” (July2011, 2012)
6. Define
i) evaporation
ii) potential evapo-transpiration
iii) Actual evapo transpiration
iv) Pan coefficient. (July2011,Dec2012)
7. Explain any three methods for determination of lake evaporation. . (June2011,Jan 2012)
8. Define the term infiltration capacity of a soil and and (June2011)
UNIT III
Hydrographs
1. What is unit hydrograph? Discuss its use and limitations. (July 2011,Dec 2012, July 2013)
2. What are the methods of estimating the runoff from a catchment? Explain any one of them. (July 2011)
3. With a neat sketch, explain the various components of a flood hydrograph. Also explain anyone method of base flow separation. (July2011, Jan 2012)
4. What are the components of unit hydrograph? Write a note on its applications.(Dec2011, June 2012)
5. Briefly explain ‘schematic representation of runoff components. (June 2011)
6. Following are the ordinates of a storm hydrograph of a river draining a catchment area of 423 km2 due to a 6h storm.. Derive the ordinates of 6h unit hydrograph & plot the same. (June 2011,2012)
UNIT IV
Estimation Of Flood & Flood Routing :
1. What do you mean by the term flood? Mention any two factors affecting flood? (July 2013)
2. Mention any two empirical formulae for estimating flood? (July 2013)
3. What do you mean by flood control? Explain any two methods of flood control. (July 2013)
UNIT V
Introduction To Irrigation
1. Define Irrigation. What are the types of flow irrigation? Explain any two flow irrigation systems. (July 2013)
2. What are the benefits and ill effects of irrigation? (July2011, July 2012,2013)
3. Explain Flow irrigation with the help of neat sketches. (July2011, 2012,2013)
4. List the methods of irrigation and explain any three methods. (July 2013)
5. What are the primary objectives of an irrigation method? List the various methods of irrigation adopted for distribution of water in the field. (July 2013)
6. What are the methods of applying water to crops? Explain any two surface irrigation methods. (July 2013)
7. List out the various methods of application of irrigation water. (including subgroups) (July 2011, Jan 2012, 2013)