gtu.ac.in PDDC Winter Exam Model Question Paper : Gujarat Technological University
Name of the University : Gujarat Technological University
Exam : PDDC – Winter Exam 2016
Document Type : Sample Question Paper
Category or Subject :
Year : 2016
Website : https://www.gtu.ac.in/
Download Sample Question Paper :
Project and Economics : https://www.pdfquestion.in/uploads/13796-Proeco.pdf
Irrigation Engineering : https://www.pdfquestion.in/uploads/13796-Irrengg.pdf
Structural Design-I : https://www.pdfquestion.in/uploads/13796-Strude.pdf
Micro controller & Interfacing : https://www.pdfquestion.in/uploads/13796-Micro.pdf
Electrical Machine – III : https://www.pdfquestion.in/uploads/13796-Elemac.pdf
PDDC Winter Exam Model Question Paper :
Subject Code: X60601
Subject Name: Construction Project and Economics
Time: 10.30 AM – 01.00 PM
Total Marks: 70
Related : Gujarat Technological University MCA Integrated Winter Exam Question Paper 2016 : www.pdfquestion.in/13792.html
Instructions :
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1 (a) Explain why project planning is necessary. Describe various steps for planning a project. 07
(b) What are the qualities required for good construction manager. 07
Q.2 (a) Differentiate between
(i) PERT and CPM
(ii) Standard equipment and Special equipment. 07
(b) Separate out activities and events from the following list
(1) Prepare budget
(2) Design completed
(3) Lay railway track
(4) Cure concrete cube
(5) Commence testing cubes
(6) Material received at site
(7) Distribute invitation card
(8) Service reservoir filled
(9)Test pipeline
(10) Prepare estimate
(11) Collect data and prepare checklist
(12) Specification prepared
(13) Drive piles for bridge (14) Payment made. 07
OR
(b) What is critical path? In a construction project following activities are planned. Draw the network and find out total project duration, critical activity and critical path.
Q.3 (a) Discuss in details the factors affecting on the efficiency of labour. 07
(b) Explain in detail resource allocation, resource leveling and resource smoothening. 07
OR
Q.3 (a) Why labour welfare is required? Explain the different methods of labour incentives. 07
(b) Define organizing? Explain Line & staff and Matrix organization structure. 07
Q.4 (a) Why material management is important? Find out the economic order quantity and order point if the lead time is 3 month from the following data. The rate of use of a particular raw material from stores is 20 units/year. The cost of placing and receiving an order is Rs.40. The cost of each unit is Rs. 100. The cost of carrying inventory in percent/year is 0.16 and it depends on the average stock. 07
(b) What are the factors affecting for the selection of construction equipment’s. 07
Subject Code: X60603 Date:26/10/2016
Subject Name: Irrigation Engineering
Time: 10.30 am to 01.00 pm
Total Marks: 70
Instructions :
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1 (a) Discuss the necessity of irrigation and scope of irrigation in India. What are the benefits and ill effects of irrigation? 07
(b)Explain with a neat sketch the drip irrigation method. 07
Q.2 (a) Explain the relationship between duty and delta. Give typical values of delta for some kharif and rabi crops. 07
(b)What are causes of water logging in an irrigation command area? Suggest suitable remedial measures to control water-logging. 07
OR
(b) Draw a typical layout of a diversion headwork scheme. Why marginal bunds are constructed on upstream side of diversion headwork? 07
Q.3 (a) What are the main causes of failure of a diversion headwork? 07
(b) Explain the various steps involved in design of a sloping glacis weir. 07
OR
Q.3 (a) Explain Blighs theory for design of headwork. What are the limitations of Blighs theory? 07
(b) Explain the corrections for (i) floor thickness (ii) mutual interference and (iii) slope at key points while design weir using Khosla’s theory. 07
Q.4 (a) Explain the seepage through a zoned type of earth dam. Discuss the stability of earth dam under steady seepage and sudden drawdown condition. 07
(b)What are causes for failure of earth dams? Discuss the measures for safe drainage in earth dams. 07
OR
Q.4 (a) Which forces are acting on a gravity dam? Discuss the various load combinations for gravity dam design. 07
(b) Explain the steps involved in design of spillways. How energy dissipation is carried out on downstream of spillway? 07
Q.5(a) Explain with sketches the elementary profile and practical profile of a gravity dam. 07
(b)Explain the Kennedy’s and Lacey’s silt theory for unlined canals. 07
OR
Q.5 (a) With a neat sketch explain the difference between an aqueduct and a level crossing. 07
(b) Explain the functions of a canal fall and canal escape. 07