Institute : National Institute of Electronics and Information Technology (nielit.gov.in)
Course : B Level Course
Subject Code/Name : BE7-R4/Software Testing And Quality Management
Document Type : Old Question Paper
Location : India
Website : nielit.gov.in
Download Model/Sample Question Paper :
January 2012 : https://www.pdfquestion.in/uploads/nielit.in/7097-jan12BE7-R4.pdf
JULY 2012 : https://www.pdfquestion.in/uploads/nielit.in/7097-jul12BE7-R4.pdf
January 2013 : https://www.pdfquestion.in/uploads/nielit.in/7097-jan13BE7-R4.pdf
JULY 2013 : https://www.pdfquestion.in/uploads/nielit.in/7097-jul13BE7-R4.pdf
January 2014 : https://www.pdfquestion.in/uploads/nielit.in/7097-jan14BE7-R4.pdf
July 2014 : https://www.pdfquestion.in/uploads/nielit.in/7097-jul14BE7-R4.pdf
Software Testing & Quality Management Sample Paper :
BE7-R4:
NOTE:
1. There are TWO PARTS in this Module/Paper. PART ONE contains FOUR questions and PART TWO contains FIVE questions.
Related : NIELIT Question Paper B Level Course Data Warehousing & Data Mining : www.pdfquestion.in/7096.html
2. PART ONE is to be answered in the TEAR-OFF ANSWER SHEET only, attached to the question paper, as per the instructions contained therein. PART ONE is NOT to be answered in the answer book.
3. Maximum time allotted for PART ONE is ONE HOUR. Answer book for PART TWO will be supplied at the table when the answer sheet for PART ONE is returned. However, candidates, who complete PART ONE earlier than one hour, can collect the answer book for PART TWO immediately after handing over the answer sheet for PART ONE.
TOTAL TIME: 3 HOURS
TOTAL MARKS: 100
(PART ONE – 40; PART TWO – 60)
PART ONE : Answer all the questions
1. Each question below gives a multiple choice of answers. Choose the most appropriate one and enter in the “tear-off” answer sheet attached to the question paper, following instructions therein. (1×10)
1.1 Which of the following statistical tools can be used to represent a large amount of data in simple chart form?
A) Cause and effect diagram
B) Histogram
C) Pareto chart
D) Control chart
1.2 Test are prioritized so that
A) You shorten the time required for testing
B) You do the best testing in the time available
C) You do more effective testing
D) You find more faults
1.3 The inputs for developing a test plan are taken from
A) Project plan
B) Business plan
C) Support plan
D) None of the above
1.4 Which of the following is not a part of the Test Implementation and Execution Phase?
A) Creating test suites from the test cases
B) Executing test cases either manually or by using test execution tools
C) Comparing actual results
D) Designing the Tests
1.5 A Person who documents all the issues, problems and open points that were identified during a formal review is known as
A) Moderator
B) Scribe
C) Author
D) Manager
1.6 A Verification is
A) Checking that we are building the right system
B) Checking that we are building the system right
C) Performed by an independent test team
D) Making sure that it is what the user really wants
1.7 Static analysis is best described as
A) The analysis of batch programs.
B) The reviewing of test plans.
C) The analysis of program code.
D) The use of black box testing.
1.8 With the acquisition of a testing tool, the test engineer’s first priority is to
A) Decide how much to pay
B) Check with end-user first
C) Identify the goal for the tool usage
D) Make sure that the management agrees to the use of the tool
1.9 What can you use to select an object as a verification point?
A) the object finder, the object picker, or the object browser
B) the main object browser, the test object browser, or the extra object browser
C) the object finder, the test object browser, or the delay method
D) the delay method, the scripting method, or the pointer method
1.10 Data collected during testing should include
A) Test Factors
B) Functions/subroutines
C) Platforms
D) All of the above
2. Each statement below is either TRUE or FALSE. Choose the most appropriate one and ENTER in the “tear-off” sheet attached to the question paper, following instructions therein. (1×10)
2.1 One of the features of Object Oriented programming is: Emphasis on procedure rather than data.
2.2 Function/Test matrix is a type of Project status report.
2.3 Faults in requirements are the most expensive to fix.
2.4 Functional testing technique helps to ensure that the requirement/specifications are properly satisfied by the software system.
2.5 When DLL files are unregistered or removed, due to uninstalling or installing, is called DLL Hell.
2.6 Water fall model is the one of the model of software testing.
2.7 Static linking and window file protection is a solution for the conflicting DLL Problems.
2.8 The purpose of boundary value analysis is to concentrate the testing effort on error prone areas by accurately pinpointing the boundaries of conditions.
2.9 Performance testing can be done during unit testing as well as during the testing of whole system.
2.10 Alpha testing is post-release testing by end user representatives at the developer’s site.
PART TWO :
Answer any FOUR questions :
5. a) It is observed that the testers in your organization are performing tests on the deliverable even after significant defects have been found. This has resulted in unnecessary testing of little value because re-testing needs to be done after defects have been rectified. You are the test manager and going to update the test plan with recommendations on when to stop testing. List the recommendations you are going to make.
b) What is the role of QAG (Quality Assurance Group) in project development?
c) What are the key challenges of software testing? (6+5+4)
6. a) What is difference between Performance Testing, Load Testing and Stress Testing?
b) What are the consequences of SQL Injection? (10+5)