Name of the University : West Bengal University of Technology
Department : Apparel Production Management
Degree : B.Tech
Sem : VI
Subject Code/Name : APM-602/CAD/CAM For Apparel Products
Website : wbut.ac.in
Document Type : Previous Year Examination Question Paper
Download Model/Sample Question Paper :
2010 : https://www.pdfquestion.in/uploads/qpaper.wbut.ac.in/6351-2010APM-602.pdf
2011 : https://www.pdfquestion.in/uploads/qpaper.wbut.ac.in/6351-2011APM-602(1).pdf
2012 : https://www.pdfquestion.in/uploads/qpaper.wbut.ac.in/6351-2012APM-602-(6151).pdf
WBUT CAD/CAM Apparel Products Question Paper
Time Allotted : 3 Hours
Full Marks : 70
** The figures in the margin indicate full marks.
** Candidates are required to give their answers in their own words as far as practicable.
Related : West Bengal University of Technology APM603 Apparel Accessories & Surface Ornamentation B.Tech Question Paper : www.pdfquestion.in/6350.html
GROUP – A
( Multiple Choice Type Questions )
1. Choose the correct alternatives for the following : 10 × 1 = 10
i) ‘Plotter’ is an example of
a) output device b) input device
c) hardware d) both (a) and (c).
ii) What is the full form of CIPMS ?
a) Computer Initiated Planning & Management System
b) Computer Integrated Production Management System
c) Computer Integrated Planning & Management System
d) Computer Integrated Production & Marketing System.
iii) What is the full form of CAPP ?
a) Computer Activated Production Process
b) Computer Added Production Planning
c) Computer Added Production Process
d) Computer Aided production Planning.
iv) ‘ERP’ stands for
a) Effective Resource Planning
b) Enterprise Resource Planning
c) Electronic Resource Planning
d) Electronically Revised Process.
v) Existing design/artwork can be digitized and edited through
a) texture mapping tool b) crop tool
c) pick tool d) clip art tool.
vi) Computerised cut planning helps to minimize the fabric wastage by
a) fabric roll allocation
b) accurate grading
c) 3D-product visualization
d) none of these.
vii) Marker efficiency percentage is determined by
a) Length of fabric used for pattern Total available length of fabric 8 100
b) Area of fabric utilized for pattern Total available area of fabric 8 100
c) Area of fabric utilized for pattern Total area of the marker 8 100
d) None of these.
viii) The type of image processing method used for computerised pattern making is
a) raster technique b) vector technique
c) both (a) and (b) d) none of these.
ix) The full form of ‘GUI’ is
a) Garment Utility Index
b) Graphic User Interphase
c) General Upgradation Index
d) none of these.
x) Automatic thread trimming is a special characteristic of
a) computerised cutting machine
b) computerised embroidery machine
c) plotter
d) all of these.
GROUP – B
( Short Answer Type Questions )
Answer any three of the following. : 3 × 5 = 15
2. Write short notes on the following :
a) 3D-product visualization
b) Dart manipulation.
3. Mention the special features of fashion CAD software.
4. Briefly mention about different types of softwares used in modern apparel industry.
5. Illustrate the principles of computerised grading.
6. Mention the application of computer in sewing technology.
GROUP – C
( Long Answer Type Questions )
Answer any three of the following : 3 × 15 = 45
7. Write short notes on the following :
a) Computerised cut planning
b) CIM
c) Features and benefits of apparel CAD software.
8. Explain how fabric wastage in apparel industry can be minimized by the application of CAD/CAM.
9. Describe different aspects & modules of the ‘ERP’ in apparel industry.
10. Illustrate the following :
a) Detailed flow-chart of process sequence in the apparel industry.
b) MRP
c) Computerised system for on time order completion.
11. Write short notes on the following :
a) CAPP
b) Application of computer in knitting technology
c) Image processing technique.
12. Explain in detail about the following :
a) Application of IT in apparel industry
b) Computerised marker planning.
CAD/CAM For Apparel Products – 2010 :
Time Allotted : 3 Hours
Full Marks : 70
** The figures in the margin indicate full marks.
** Candidates are required to give their answers in their own words as far as practicable.
GROUP – A : ( Multiple Choice Type Questions )
1. Choose the correct alternatives for the following : 10 1 = 10
i) Write the full forms of PDS and MTM.
ii) Plotter is an example of
a) Input device b) Output device
c) Memory device d) none of these.
iii) Write the full forms of CAPP & RDBMS.
iv) Fabric utilization cna be improved through
a) Cut order planning software
b) Fashion CAD software
c) ERP software
d) none of these.
v) Which of the followings are a characteristic of fashion CAD software ?
a) Multi Grading options
b) 3D product visualization
c) Market planning
d) ERP.
vi) Delay in order processing can be avoided by
a) ERP b) CAPP
c) MRP-I d) all of these.
vii) Robotics is useful for
a) CIM b) QRM
c) MRP d) both (a) and (b).
viii) Apparel costing can be done through
a) Production Planning Software
b) Merchandising Manager Software
c) Cut Planning Software
d) All of these.
ix) Write the full form of BIOS & OMR.
x) Which of the followings can be used to create and access a Database package ?
a) CorelDraw b) Ms-Word
c) SQL d) VB.
GROUP – B : ( Short Answer Type Questions )
Answer any three of the following. 3 5 = 15
2. Make a brief comparison between RAM and ROM.
3. Write short notes on the following :
a) Digitizer
b) Significances of MRP in Apparel industry.
4. Develop a FLOWCHART algorithm to determine the labour cost for stitching a Men’s Formal Shirt. User is supposed to provide the observed time of the job/elements, performance rating %, total allowance % , and hourly wage rate.
5. Explain the principles of Computerised Grading.
6. Develop a FLOWCHART Algorithm for computerized order follow up in apparel industry.
7. Mention the steps involved and tools used in PDS.
Group – C : ( Long Answer Type Questions )
Answer any three of the following. 3 15 = 45
8. a) Develop of FLOW diagram to show the path of information flow in case of a CIM for Apparel manufacturing.
b) Illustrate a detailed tree diagram to show different areas of the application of Computer in Apparel Industry. 7 + 8
9. a) Explain the advantages and principles of 3D Product Visualization for Apparel Products.
b) Develop a FLOWCHART algorithm to calculate the total expenditure for overtime payment for the operators in a sewing department for a particular order. 9 + 6
10. a) Develop a FLOWCHART algorithm to illustrate the principle of order concentration chart in Apparel Industry.
b) Explain different features fo Computerised Embroidery. 7 + 8
11. a) Explain the significance of different elements and Modules of ERP system for Apparel Industry. Use suitable Block Daigrams to illustrate the significance.
b) Explain different Image Processing Techniques.
12. a) Explain the basic principles of Lay lot planning through a suitable flow diagram. Write the features of Cut Planning Software.
b) What do you mean by finite scheduling ? Mention in brief the different types of finite scheduling. 7 + 8
13. Write short notes on the following : 5 + 5 + 5
a) Steps involved in Computerized Marker Planning
b) Application of 3D body scanning in Apparel Industry
c) Principles of Fabric Roll Allocation.